Night view of Tsukiji Bridge(Chuo)
3.3
- Beatiful 3.5
- Access 3
- Amosphere 3.4
- Little 3.2
Today's beautiful night view time
17:43〜18:03
Visit Report of Tsukiji Bridge
The Tsukiji Ohashi Bridge connects Tsukiji and Kachidoki.
Completed in 2018, this bridge features a modern design and is illuminated every evening from sunset until 11 p.m.
Located at the most downstream position across the Sumida River, it offers unobstructed views of the buildings in Hamamatsucho, Shibaura area, Tokyo Tower, and more. Hence, the night view level here is exceptionally high.
The pedestrian walkway is also generously wide, making it a recommended spot for those who want to enjoy Tokyo's night view while crossing the bridge.
Information about Tsukiji Bridge
Name | Tsukiji Bridge |
---|---|
Nightscape features | |
Address | 5 Tsukiji, Chuo-ku, Tokyo |
Opening hours | Open all day |
regular closing day | None |
admission fee |
Free
|
Related links |
How to get to Tsukiji Bridge
By train |
|
---|---|
By Car | - |
View from Tsukiji Bridge(Photo List)
Here are some night view photos taken at Tsukiji Bridge .
Please refer to the atmosphere of the Tsukiji Bridge and what views can be seen.
Tsukiji Bridge illuminated.
Footpath on the Tsukiji Bridge
Night view of buildings in the direction of Hamamatsucho from the Tsukiji Bridge.
Footpath on the Tsukiji Bridge
Night view of Tokyo Tower and Minato Ward
Night view towards Takeshiba
View of Takeshiba Wharf.
Sunset view from the Tsukiji Bridge.
View of Kachidoki Gazebo Park, Chuo Ward, Tokyo.
Tsukiji Bridge lit up in yellow.
Tsukiji Bridge FAQ
What is the recommended time for night viewing on 2/15
The 30-minute period from 17:43〜18:03 is the twilight time when the night view is most beautiful.
What kind of night view can I enjoy?
The view includes buildings in the Hamamatsucho and Shibaura areas, Tokyo Tower, the Kachidoki condominium tower complex, and the illuminated Kachidoki Bridge.
Until what time is the Tsukiji Bridge illuminated?
The Tsukiji Ohashi Bridge is illuminated from sunset to 23:00.
When was the Tsukiji Bridge opened?
The Tsukiji Bridge was opened in 2018.
- Release day:2023/10/28
- Update day:2024/05/29